Cabinet Training Internal Resource Guide

CABINET APPOINTMENT PREPARATIONS

Cabinet Prep For Installation Checklist

Clear the Installation Area • Remove all furniture, appliances, and debris. • Remove breakables, valuables, and personal belongings. • Secure pets away from the work area.

Remove Existing Cabinetry (if not part of installer’s scope) • If tear-out is included: Empty all cabinets beforehand. • If tear-out is not included: Remove both existing cabinets and contents. Pre-Work Completion • Complete all painting. After cabinet installation is completed, touch ups should be expected • If electrical is added or relocated, complete prior to cabinet installation. • If plumbing is added or relocated, complete prior to cabinet installation. • Complete structural work prior to installation. • Verify that any modifications (walls, flooring, soffits) are complete. • Lead-Safe Practices: If your home was built before 1978, please inform the cabinet installer if there are children under six or pregnant women in the home. Prepare the Home Environment • Ensure the space to store cabinets is climate-controlled, dry, and moisture-free. • If you have cabinet trim, make sure it is stored completely flat to prevent damage or warping. • Turn off central heating/AC during sanding to reduce dust spread. Cabinet Delivery & Inspection • Be present for cabinet delivery. • Confirm shipment is complete. • Immediately note any exterior damage on delivery paperwork. Temporary Kitchen Planning • Create a temporary food prep area with: • Small refrigerator • Microwave • Accessible water source • Disposable utensils/paper goods • Pre-plan meals during installation. Decision Maker Present • A decision maker 18 years or older must be present and remain available for the entire appointment

REV 9/2025

16 © 2025 Sage Surfaces LLC

Made with FlippingBook Learn more on our blog