Sage University 2021 - Small Projects
HOW TO PROCESS AN ORDER IN METIS
Set scheduled delivery date once the top is fabricated and ready to be delivered. The delivery day should be the same day each week and communicated to the store This builds associates’ confidence in the program and your service Lead times should not be longer than 7-10 business days unless material is needed to be ordered Once top is delivered, enter in Delivery Date and upload the signed packing slip as COC.
© 2021 Copyright Sage Surfaces, LLC. All rights reserved.
Made with FlippingBook - Online Brochure Maker